How to Compare Roof Estimates When the Totals Don't Match
"i had to pay extra as some of the decking had to be replaced that wasnt anticipated."
A commenter in a roofing thread described that surprise.
Compare the lines, not the totals. Two bids can differ because one prices work the other leaves out, and that gap is where surprise charges hide. Ask every roofer to put the same items on paper: the work, the materials, the completion date and the price1. Once every bid answers the same questions, the differences become choices you can weigh.
Quick answer:
- Ask each roofer for the scope of work, materials, start and completion dates, and payment terms2 in writing.
- Check that every bid says what happens to the old roofing, the flashing and any damaged wood3.
- Ask how hidden damage is priced and approved before the crew opens the roof.
- Treat the lowest bid4 as a question: find out what it leaves out.
On this page
Today you can email each roofer the same list of items and ask them to fill in whatever is missing.
What should a written roof estimate say?
It should name the work, the materials, the dates and the price, so several bids can be set side by side1. Payment terms belong on the list too, because they are part of what you are agreeing to2. In North Carolina, homeowners are told to ask for a breakdown of the costs and the warranty details5.
A single number with a two-line description gives you nothing to compare. One reply in a thread put the fix in six words: "You should ask for a breakdown."
Promises made out loud count for little once the job starts. Get all promises in writing6 and spell out exactly what the contractor will and will not do.
Not sure which items have to appear on the estimate? What is included in a roof replacement.
Lines that explain a gap between two bids
When two totals are far apart, look first for items one bid has and the other lacks. Three are worth checking on every estimate.
Tear-off. This means stripping the old roofing before the new goes on. One voluntary high-wind home standard describes a full replacement as one that will remove all existing roofing material and replace any damaged wood3. If a bid does not say exactly what would be done with the old layers, ask.
Flashing. This is the material that seals the joints and edges of a roof, where water likes to find a way in. The same standard lists proper flashing at penetrations, roof/wall intersections, valleys, gables and eaves3. Treat that as an example of lines to look for. If one bid skips flashing, ask why before assuming it is a bargain.
Damaged wood. This is the next section, because it is where a fair-looking bid can leave you having to pay extra.
What if the crew finds rotted decking when the roof is opened up?
Then the price can change after the job starts, so get the rule on paper before it does. Decking is the wood boards under the shingles. Once the old roofing is off, a crew can find boards that have to be replaced, which is the case in the opening quote.
One Oklahoma state-program form names rotted decking and structural damage as examples of an unforeseen field condition7. That form is a change order: a signed paper that records the extra work and what it costs. On it, extra work is agreed by signing, and both parties accept the changes in scope, cost and schedule7 written there.
Another commenter described the line to look for: "any roofing estimate should have a line item declaring cost of repairs like replacing the decking". Ask each roofer to put the decking price and the approval step in writing. The Quote Decoder below writes a message for each roofer, from the quotes you enter.
If a roofer won't put this in writing, that is an answer too: weigh it against the bids that do.
One bid prices the wood and another leaves it out? What roof rot means and what to get in writing.
Should you skip the cheapest bid?
Not automatically, but find out what it leaves out. The trade association for roofing contractors advises a healthy skepticism about the lowest bid4, and says price is only one criterion for choosing a roofer.
Skepticism means asking questions, not throwing the bid away. Hold it against the others line by line. If it doesn't have a line item for removing the old roofing or for damaged wood, ask what happens when those come up. In Texas, getting more than one bid helps show which offers are too high or too good to be true8.
A checklist for the quotes you are getting
Put your bids in a row and mark each item. Anything not specified in a roofer's estimate becomes a question for that roofer.
- Work and materials: whether the old roofing comes off, the new materials, the flashing, and how damaged wood is handled.
- Dates and payment terms: start and completion dates and when payments are due2.
- A cost breakdown and warranty details written out, not just a total5.
- Extra work: how hidden damage is priced, and a signed change order before it goes ahead.
- The roofer: license checked with your state or county, proof of insurance and a written contract9, plus who applies for the permit.
If a line is missing, send every roofer the same email and ask them to add it. Wait for the answers before you compare totals. Avoid high-pressure sales tactics or contractors who demand full payment upfront2.
Already picked a bid and wondering what to check before you sign? What a roof replacement contract should say.
Roof Quote Decoder: compare your quotes side by side
Type in what your written quotes say. You'll see how they differ, what each one is missing in writing, and a message for each roofer. Nothing you type leaves this page.
Quick questions
How many estimates should I get? At least 3 written estimates2 is the advice from a building-safety research group. Three gives you a middle and an outlier to question.
What should I ask about the warranty? What it covers, how long it lasts and who stands behind it. Get the answers written into the estimate, not just heard from the estimator on the phone.
Can a calculator replace written estimates? A calculator gives a number without your roof's details. The price you pay depends on what each bid includes, so use written bids for the decision.
What if a roofer doesn't send the estimate? Send one reminder in writing, then move on. A bid that doesn't arrive cannot be compared.
What is the 25% rule? It is a Florida provision that covers a roof or roof section built, repaired or replaced under the 2007 Florida Building Code or later10. Once 25 percent or more of it is repaired, replaced or recovered, only that portion has to meet the code in effect10. If a roofer cites it on a bid, ask which code they mean and get the answer in writing. Outside Florida, ask your local building department.
Sources
1. Federal Trade Commission, "How To Avoid a Home Improvement Scam
2. Insurance Institute for Business & Home Safety, "Tips for Hiring a Roofing Contractor
3. IBHS FORTIFIED, "FORTIFIED Home Re-Roofing Checklist (v2024.1)
4. National Roofing Contractors Association, "Selecting a Contractor
5. North Carolina Department of Insurance, "Avoiding predatory roofing scams
6. California Contractors State License Board, "Tips for Hiring a Roofing Contractor
7. Oklahoma Insurance Department, "Change Order Information" (Strengthen Oklahoma Homes template)
8. Texas Department of Insurance, "Hail damage to your home or car? What to do next
9. Federal Trade Commission, "Four ways to avoid scams after a weather-related disaster
10. Florida Legislature, Florida Statutes 553.844(5)
Also cited by the Roof Quote Decoder tool on this page:
11. Texas Department of Insurance: Do you know the signs of a contracting scam?
12. California Contractors State License Board (CSLB): What You Should Know Before You Hire a Contractor
13. NRCA (National Roofing Contractors Association): NRCA Roofing Guidelines Glossary: Square
14. California Contractors State License Board (CSLB): Terms of Agreement: A Consumer Guide to Home Improvement Contracts
15. Maine Office of the Attorney General: Home Construction and Repair
Found an error on this page? Email [email protected].